Right now is a rare window for a loop trail around Lodi that builds itself and saves the city money on maintenance. Phase 4 of the Development Code update reaches the City Council in October, and it will set the rules for how land joins the city for decades. Ahead of that hearing I’m preparing the formal comment below, and I’m publishing it here first because it will be better with your eyes on it. Tell me what I have wrong, what’s missing, and what would sharpen it, in the comments or by reply. The draft amendments are posted at planlodi.com/code-amendments, and your own comments can reach the Council record at councilcomments@lodi.gov.
To: Members of the City Council, City of Lodi
Re: Phase 4 Development Code Amendments (File 2025-01 Z), suggested additions for the trail network
Dear Members of the Council:
My name is Matt Teresi. I live in Lodi and write through Trailshed, a local initiative for trail advocacy and early-stage trail development in San Joaquin County. I’m writing about the Phase 4 code amendments coming to you on October 7.
Phase 4 sets the rules for how land joins the city, and it is careful work. I support its adoption. I’d like to suggest four small additions that would help those rules deliver a connected trail network as Lodi grows, at very little cost to the City. Draft language is enclosed, and staff could certainly improve on it.
A lower-cost kind of open space
A conventional park acre is expensive to keep. It is mowed weekly through the summer, watered year-round, and renovated on a cycle. The national median operating cost is about $8,600 per park acre per year, and over $11,000 for cities Lodi’s size (NRPA, 2025). By comparison, routine maintenance of a finished trail averages $500 to $1,000 per mile per year (Rails-to-Trails Conservancy). A mile of fifty-foot trail corridor is about six acres, so the corridor costs a small fraction of what the same acreage costs as turf.
This matters here. The City’s 2026 fee study found that once parks maintenance is counted, cost recovery falls from 39 to 25 percent, and the General Fund subsidy is headed toward $4 million a year by 2030.
Phase 4 requires five acres of parkland per 1,000 residents, and as drafted, all five default to the higher-cost kind. If a capped share of that land could instead come as trail corridors, developers would build them at their own expense, plant them in native, drought-tolerant cover, and connect them to the rest of town. The financing plans already required for annexations could carry their upkeep, the same way landscaping and basins will be handled.
Four small additions
The draft already names trails in its guiding principles and requires a trail plan in every master plan. These additions would give those provisions a network to connect to and a way to pay for themselves.
A map. Ask each master plan’s trail element to follow the General Plan’s trail alignments, including the WID canal corridors it has carried since 2010 (Policy P-P8), and to connect with neighboring areas. Then begin work on a citywide trails map the code can reference. Davis mapped a greenway loop into its General Plan in the late 1980s, and its subdivisions delivered it piece by piece; the city built only the two tunnels developers couldn’t.
Built with the subdivision. When a mapped corridor crosses or borders a project, dedication and construction of that segment becomes a normal condition of the map. Folsom’s code has worked this way for years.
Counted toward parkland, up to a cap. Trail corridors at least fifty feet wide that connect to the network could satisfy a capped share of the five-acre requirement. Colorado Springs and Cary, North Carolina both allow this, and Cary passed 100 greenway miles in 2024.
Finished with the neighborhood. Mountain House requires each segment’s improvements to be complete by the time 80 percent of the nearby homes are finished. Similar timing language would keep trail segments from being deferred indefinitely.
Why it would be worth it
The two fastest-growing cities in California over 30,000 residents are both in San Joaquin County (state estimates, 2026). Both wrote trails into their plans before the first house sold: River Islands in Lathrop has a designated loop trail in its zoning, and Mountain House has the timing rule above. Lodi has something those communities can’t build: a compact, hundred-year-old city that a loop trail could actually encircle, tied by canal corridors to a river, a lake, and a working downtown.
A Caltrans District 10 study of bicycle tourism in five counties (2021) found the Lodi area had the highest ridership of any area studied, thanks to its winery and tourism brand: more than 15,700 rides and over $2 million a year in local spending, with room to grow to $3 million or more. Lodi’s wineries draw roughly 990,000 visitors and $211 million a year. A continuous, signed loop connecting downtown, the lake, the river, and the vineyard edge would give visitors one more reason to stay: a wine country you can ride around.
The window
Land for a corridor can be reserved when an area is master planned. Afterward it can only be assembled parcel by parcel, which rarely happens. Phase 4 is the scheduled opportunity to set these rules; Phase 5 covers other subjects.
I respectfully ask that the Council consider these additions for the ordinance at first reading, or ask staff to evaluate them for a follow-up amendment this winter. I’d be glad to share the research behind this letter, draft language, and a candidate network map at no cost. Thank you for the work that has gone into Phase 4, and for considering this.
Respectfully,
Matt Teresi
Trailshed
matt@inferterra.com
Enclosure A: Model language
Draft language, offered as a starting point. Bracketed values are policy choices.
A-1. Master plan continuity (add to 17.77.100(G)(6)). “The parks, open space, and trail plan shall implement trail alignments designated in the General Plan or any adopted citywide trails plan, and shall demonstrate connectivity to the citywide trail network and to existing or planned trail corridors in adjacent planning and annexation areas, including corridor continuity across master plan boundaries.”
A-2. Dedication and improvement (add to Chapter 17.77 or 15.70). “Where a trail or greenway corridor designated in the General Plan, an adopted citywide trails plan, or an approved master plan is located within or contiguous to a proposed subdivision or development project, the applicant shall dedicate the corridor and shall improve or agree to improve the trail segment as a condition of approval, consistent with City standards.”
A-3. Eligibility and credit (add to 15.70.060; replace 15.70.100). “Land dedicated for park and recreational purposes may include linear parks and trail or greenway corridors that provide public access, meet minimum width standards established by the City, and are consistent with the General Plan and any applicable master plan. Trail or greenway corridors a minimum of fifty (50) feet in width that connect to the citywide trail network may be credited against the parkland dedication requirement of this chapter, up to a maximum of [25–50] percent, as approved by the City.”
A-4. Completion trigger (add to 17.77.100 or 15.70.095). “Trail and open space improvements serving a neighborhood shall be completed no later than the time at which eighty (80) percent of that neighborhood’s dwelling units have received final inspection, and pedestrian connections shall be provided to schools and at the ends of cul-de-sacs where feasible.”
Enclosure B: Precedents in brief
Folsom, California. FMC 16.32.010(A): subdividers “shall dedicate or make an irrevocable offer” of land for “public greenways, bicycle paths, trails” and shall “improve or agree to improve” them as a standard tentative-map condition. The Folsom Plan Area delivers more than 30 miles of trails and 30 percent open space alongside full parkland.
Colorado Springs, Colorado. UDC 7.4.307.F.2.b: land “dedicated for trails that are a minimum of fifty (50) feet wide may be credited against the requirement of dedication for neighborhood and community park purposes up to a maximum of one hundred (100) percent,” conditioned on park-system master plan consistency.
Cary, North Carolina. LDO 8.2.1(D): where the parks master plan shows a future greenway through a development, a 30 to 50 foot strip “shall be dedicated,” and that land “may be counted towards park land dedication requirements.” Cary passed 100 greenway miles in 2024.
Davis, California. DMC 36.08.010 makes “public greenways, bicycle paths, trails” a standard subdivision dedication category. A General Plan greenway loop mapped in the late 1980s was delivered with growth; the city funded only the two tunnels that closed the gaps. Sixty-plus miles of city greenbelts.
San Juan Capistrano, California. Section 9-4.505(c)(1): where General Plan trails are “within property to be developed, or contiguous thereto, the developer shall construct and dedicate such facilities as public use easements.”
Lathrop, California (River Islands). LMC 17.61.110(D)(5): every planning-district precise plan must diagram its “open space and trail corridors”; the adopted design concept designates a Main Loop Trail and a Secondary Loop Trail. Second fastest-growing city in California, 2026 Department of Finance report.
Mountain House, California. Specific Plan III 7.2.4.3(d): segment open-space improvements complete by 80 percent of final inspections, with required school and cul-de-sac connections. Fastest-growing city in California, 2026 Department of Finance report.
Raleigh, North Carolina. UDO 8.6.1: greenways designated in the comprehensive plan “shall be platted and dedicated” when a subdivision touches them; roughly 117 miles assembled since 1974.
Meridian, Idaho. UDC 11-3A-8: multiuse pathways “shall be required consistent with the comprehensive plan within new residential and commercial developments” so that an alternate transportation system is provided throughout the urban service area.
State authority. Government Code 66477 (Quimby) authorizes dedication “for park or recreational purposes” and leaves credit “as determined by the legislative body”; Government Code 66475.1 expressly authorizes bicycle path dedication requirements. Nothing in state law prevents any of these additions.
Data sources: NRPA 2025 Agency Performance Review (operating cost per park acre); Rails-to-Trails Conservancy, Maintenance Practices and Costs of Rail-Trails (routine cost per trail mile); BerryDunn Comprehensive Program and Fee Study, Lodi Parks and Recreation Commission, June 2, 2026; California Department of Finance E-1 Estimates, 2026; Promoting Safe Bicycle Travel Opportunities for Bicycle Tourism and Economic Development, Caltrans District 10 five-county study, 2021. All code quotations verified against primary sources, August 2026.