On Wednesday, October 7, the Lodi City Council holds a public hearing on the Westside “F” annexation, 96 acres between Vine Street and Kettleman Lane on the west edge of town. It will be the first large area master planned while the City writes its Phase 4 rules for how land joins Lodi, which makes it a chance to set a precedent: trails as one of the things that set Lodi apart as a place to live. Below is the comment I am submitting. It is built around one idea from Christopher Alexander, that a town and its countryside should meet in fingers rather than a hard edge, and one street that could become the first of them. If you see it the same way, or differently, comments reach the Council record at councilcomments@lodi.gov until 5 p.m. on the 7th, and the meeting starts at 7 p.m. at the Carnegie Forum.
Caption: A proposed Class I trail from the Woodbridge Irrigation District canal at Mills Avenue, through the Westside “F” annexation, to the WID lateral just west of town. Dashed blue lines show the wider WID canal network as potential future alignments. Concept sketch; base data © OpenStreetMap contributors.
To: Mayor Ramon Yepez and Members of the City Council, City of Lodi
Re: Item F.1, Westside “F” Annexation (PL2024-023 A): Vine Street and trail corridors
Dear Mayor Yepez and Members of the Council:
My name is Matt Teresi. I live in Lodi and work through Trailshed on trails in San Joaquin County. I am writing in support of the Westside “F” annexation, and to suggest one opportunity in particular: a Class I trail along Vine Street, reaching from town into the countryside.
A finger into the countryside
In A Pattern Language (1977), Christopher Alexander and his colleagues argued that a city and its farmland should meet in long, interlocking fingers rather than along a hard edge, so that everyone lives within about a ten-minute walk of open country. Their pattern reads simply: “Keep interlocking fingers of farmland and urban land.” Lodi’s west side still has that shape.
Vine Street is one of the corridors I have watched people use to leave town and wind out into the country. Past Lower Sacramento Road and the high school, it reaches the north edge of the annexation area, where the neighborhoods give way to vineyards and open farmland. A Class I trail along it would be a finger into the countryside: a way out of town and into the vineyards without ever sharing a lane with fast traffic.
Vine Street also links two canal corridors. Near Mills Avenue it crosses the Woodbridge Irrigation District canal that the General Plan has set aside for a walking and biking trail since 2010 (Policy P-P8). West of town, the irrigation district’s canal alignment is a natural future connection point for a trail reaching into the countryside. A path on Vine would be the connector between the two.
The timing is right because this annexation brings the future West Vine Street right-of-way into the City. The City’s bicycle plan shows Vine Street only as bike lanes and a signed route; a shaded Class I path would also serve families, kids headed to school, and visitors riding through wine country.
The first plan under a new process
The staff report describes Westside F as the last Phase 1 growth area substantially surrounded by the City, and notes that its development will require comprehensive master planning. It will be planned while Phase 4 is being adopted. The Phase 4 draft already asks each annexation master plan to include a parks, open space, and trail plan, and asks dedicated parkland to connect to the City’s trail network. Westside F is likely where that intention first takes shape. While land is still planned as a whole, a corridor can be set aside at almost no cost; once lots are mapped, it can only be pieced together parcel by parcel.
The General Plan map (Attachment 3) shows open space at the center of the site, where the pre-zoning exhibit (Attachment 4) places the roughly 10-acre Public and Community Facilities site, about two acres of which would be reserved for a future fire station. The annexation also brings in the Taylor Road right-of-way west of Westgate Drive.
Suggestions
I would suggest Council consider giving staff the following direction as the master plan is prepared.
A Class I path on Vine Street. As the West Vine Street right-of-way is designed, it could include a Class I path on the annexation side, in a planted parkway, laid out so it can later extend east to the canal at Mills Avenue and west to the irrigation district canal beyond town.
A trail plan that connects to it. The master plan’s trail element could tie the Vine Street path to the central public site, with the acreage beyond the fire station planned as a hub the paths lead to, and use the Taylor Road right-of-way as an east-west link to the existing city. Each path would continue across the plan’s edges rather than stopping at the property line.
Phase 4 when it returns. The Phase 4 hearing was set for this meeting but is not on the agenda. When it comes back, three small refinements to the trail language already in the draft would help Westside F and every master plan after it connect to one network: naming trail and greenway corridors in the open space list in 15.70.095(B)(2); asking each master plan’s trail plan in 17.77.100(G)(6) to follow General Plan alignments and connect across plan boundaries; and naming a Class I path as the corridor standard, with a Class IV separated bikeway as the fallback along arterials. A trails vision plan would then give these provisions one map to point to, with Vine Street as its first finger into the countryside.
Why it is worth doing
Trail corridors are a way to grow open space without growing maintenance at the same rate. The national median cost to operate a park acre is about $8,600 a year, and over $11,000 in cities Lodi’s size (NRPA, 2025). Routine upkeep on a finished trail runs $500 to $1,000 per mile per year (Rails-to-Trails Conservancy). This is not an argument for fewer parks. It is a case for letting some share of new open space arrive as developer-built, tree-lined corridor that connects to the rest of town. It also draws visitors: a Caltrans District 10 study (2021) found the Lodi area had the highest bicycle tourism ridership of the five counties studied, worth more than $2 million a year in local spending.
I would be glad to help staff at no cost to the City, including a first working map of the Vine Street corridor and draft language staff can edit or set aside.
Thank you to Council and staff for the careful work on this annexation and on Phase 4.
Respectfully,
Matt Teresi